This link canal was proposed to divert surplus water of the rivers, like Par, Auranga, Ambica, Purna and Tapi, up to Vadodara branch of Narmada Command.

About 1,350 MCM surplus water is proposed to be diverted by the Par-Tapi link canal up to Ukai Dam and 2,904 MCM surplus water is proposed to be diverted by the Tapi-Narmada link canal (including 1,554 MCM surplus water of Tapi at Ukai). The total length of the Par-Tapi-Narmada link canal is 402 km – the length of the Par-Tapi link will be 177 km and the Tapi-Narmada link will be 225 km. Seven reservoirs are proposed in the upstream catchment area of 2,573 sq. km. The link canal passes through dense forest and hilly region.